GF-6 Railroad and Tunnel Construction (2023-05-31)

Railroad and tunnel construction. Construct railroad lines, including clearing, filling, shaping, compacting, placing riprap, stabilizing, setting roadbeds, ties, tie plates, rails, rail connectors, frogs, switch plates, switches, and all appurtenances necessary for an operational railroad line, including bridges, culverts, tunnels, retaining walls, dikes, fences, gates, tool sheds and landing or parking platforms for equipment. Includes welding operations necessary for rail construction.

You will be allowed 2 hours to write an essay examination describing, in as much detail as possible, the tasks required to perform the above license classification. We want to know how you would do each task (using the labor, material, and equipment required) on a step-by-step basis. You may describe projects that you have done to completely explain the knowledge, skills and abilities required to perform a quality job in a safe and efficient manner. 

The reference material listed below was used to prepare the questions for this examination.  The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available.  For Code questions, the examinations will be based only on the edition of the Code book that is listed.

These products apply to test outline dated 2023-05-31

Click Here to View the Candidate Information Bulletin Click Here to View the Candidate Information Bulletin



Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.
In Stock These books are currently in stock.
Out of Stock These books are currently out of stock.

Sorry there are no products for the test: GF-6 Railroad and Tunnel Construction . Choose another test