Choose a state

C-2G Photovoltaics (2017-05-01)

The installation, alteration and repair of photovoltaic cells, batteries and inverters used in the conversion of solar energy in to electricity, but not the installation, alteration or repair of electrical wires beyond the service panel.

# of Questions 75
Minimum Passing Score of 70%
Time Allowed of 2.5 Hours

These products apply to test outline dated 2017-05-01

Click Here to View the Candidate Information Bulletin Click Here to View the Candidate Information Bulletin

Email this page to a friend

Your Name:
Friend's Email Address:

Add a message:




Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.

  • Open Book

    Blank Quick Reference Tabs

    $10.16

  • Closed Book

    Photovoltaic Systems 2012

    3rd Edition Edition
    Publication Year: 2012

    $130.00

    Photovoltaics, along with other renewable-energy technologies, is a rapidly growing sector of the energy market. Photovoltaic Systems, Second Edition, is a comprehensive guide to the design, installation, and evaluation of residential and commercial photovoltaic (PV) systems. The textbook covers the principles of photovoltaics and how to effectively incorporate PV systems into stand-alone or interconnected electrical systems. The content includes system advantages and disadvantages, site evaluation, component operation, system design and sizing, and installation requirements and recommended practices. Common scenarios and procedures are discussed throughout.
  • Closed Book

    Ugly's Electrical Reference, 2014

    Publication Year: 2014

    $28.90

    Ugly's Electrical References is designed to be used as an on-the-job reference. Used worldwide by electricians, engineers, contractors, designers, maintenance workers, instructors, and the military; Ugly's contains the most commonly required electrical information in an easy-to-read and easy-to-access format.
  • Closed Book

    Code of Federal Regulations, 29 CFR Part 1926 (OSHA) 2017

    Publication Year: 2017

    $26.78

    Make compliance with dense government safety regulations simple with MANCOMM’s 29 CFR 1926 OSHA Construction Industry Regulations. Updated through January 2017, the book provides you with a comprehensive set of the most up-to-date Construction regulations. Utilizing MANCOMM’s signature formatting approach – RegLogic – this edition includes notations for changes within the past year and letters of reference.
  • Open Book

    NFPA 70: National Electrical Code (NEC) Softbound, 2005 Edition

    2005 Edition

    $89.50

  • Open Book

    NFPA 70: National Electrical Code (NEC) Handbook, 2005 Edition

    2005 Edition

    $178.00