A-17 Lines to Transmit Electricity (2022-07-19)

03/03The installation, alteration and repair of primary overhead lines which transmit electricity, including the erection of poles, towers, anchors, guys, transformers, substations, circuit breakers and any other related hardware, equipment or systems.

40 Questions
70% Minimum Passing Score
1½ Hours

The reference material listed below was used to prepare the questions for this examination.  The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available.  For Code questions, the examinations will be based only on the edition of the Code book that is listed.

These products apply to test outline dated 2022-07-19

Click Here to View the Candidate Information Bulletin Click Here to View the Candidate Information Bulletin



Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.
In Stock These books are currently in stock.
Out of Stock These books are currently out of stock.

  • Closed Book In Stock

    Blank Quick Reference Tabs

    $13.00

  • Closed Book In Stock

    Lineman's and Cableman's Handbook 14th Edition

    14th Edition

    $90.00

    The definitive guide to distribution and transmission line technology―fully revised for the latest standards

    Thoroughly updated to reflect the 2023 National Electrical Safety Code® (NESC®), this classic resource explains the principles and practices of electric transmission and distribution line construction, operation, and maintenance. You will get comprehensive coverage of the newest equipment, techniques, and procedures along with current OSHA, ANSI, and ASTM regulations. Detailed illustrations and photos make it easy to understand the material, and self-test questions and exercises reinforce key concepts. An industry standard since 1928, this guide also serves as a valuable on-the-job reference for electric transmission and distribution grid system professionals.

     

  • Closed Book In Stock

    Code of Federal Regulations, 29 CFR Part 1926 (OSHA) 2024

    Publication Year: 2024

    $32.00

    The OSHA 29 CFR 1926 Construction Regulations book offers convenient access to vital safety guidance for both employers and employees, aiding in the prompt identification of potential hazards on any job site. Its user-friendly design features a two-color layout, simplifying navigation and comprehension of regulations. It encompasses all 1926 regulations, along with 1903 regulations on inspections, citations, and penalties, as well as 1904 regulations concerning record keeping and reporting of occupational injuries and illnesses. Additionally, select 1910 regulations relevant to construction industries are included. The book highlights regulation changes between releases and provides easy-to-access OSHA interpretations, aiding in clarity and reference. Essential documents such as OSHA Form 300 and the Cancer Policy are incorporated. In-Cite Referencing to applicable 1910 regulations is provided for further context. Lastly, the book outlines the Most Frequently Cited Standards preceding relevant Subparts, enhancing its utility as a comprehensive safety resource.