Choose a state

C-21F Chilled and Hot Water Systems (2018-03-29)

The installation of boilers, chillers, coils, cooling towers, piping, pumps, storage tanks, valves and other equipment used in the production and transfer of water for the control of temperatures.

50 Questions
70% Minimum Passing Score
2 Hours

These products apply to test outline dated 2018-03-29

Click Here to View the Candidate Information Bulletin Click Here to View the Candidate Information Bulletin

Email this page to a friend

Your Name:
Friend's Email Address:

Add a message:




Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.

  • Open Book

    Blank Quick Reference Tabs

    $10.16

  • Closed Book

    Low Pressure Boilers 5th Edition

    $94.00

    Low Pressure Boilers is the leading resource for preparing for low pressure boiler operator and facility operating engineer licensing. This textbook provides a comprehensive overview of the latest information on the safe and efficient operation of low pressure steam and hot water boilers, cooling systems, and related equipment. Each chapter is divided into sections to aid comprehension of key concepts. To assist with preparing for a licensing exam, a separate chapter with test-taking tips and a sample exam is included.

  • Closed Book

    Modern Refrigeration and Air Conditioning 20th Edition

    20th Edition

    $135.00

    Modern Refrigeration and Air Conditioning is the HVACR standard for a new generation of learner. Whether you're in a digital or print, on-ground or hybrid environment, this integrated learning solution will engage students with resource elements including textbook content, an online learning platform, video clips, narrated animations, digital activities, questions, and hands-on lab activities to assess and to reinforce learning based upon the original HVACR industry standard.

  • Open Book

    Code of Federal Regulations, 29 CFR Part 1926 (OSHA) 2019

    Publication Year: 2019

    $26.78

    All Federal Construction Regulations (29 CFR 1926) are included in this “perfect bound” book in an easy-to-read, two-color layout.

    All 29 CFR 1926 regulations for construction industry are included along with the following items:

    29 CFR 1903 regulations covering inspections, citations, and penalties
    29 CFR 1904 regulations covering recording and reporting occupational injuries and illnesses
    OSHA keyword dictionary
    Easy to find OSHA interpretations

  • Open Book

    Uniform Mechanical Code 2012

    $115.00

    Uniform Mechanical Code 2012 provides complete requirements for the installation and maintenance of heating, ventilating, cooling and refrigeration systems, while at the same time allowing latitude for innovations and new technologies.

  • Open Book

    Uniform Plumbing Code 2012

    2012 Edition

    $120.00

    The UPC established minimum requirements and standards for the protection of the public health, safety and welfare. 101.2 Scope. The provisions of this code shall apply to the erection, installation, alteration, repair, relocation, replacement, addition to, use, or maintenance of plumbing systems within this jurisdiction. Includes all potable water, building supply, and distribution pipes; all plumbing fixtures and traps; all drainage and vent pipes; and all building drains, and building sewers, including their respective joints and connections, devices, receptors, and appurtenances within the property lines of the premises and shall include potable water piping, potable water treating or using equipment, medical gas and medical vacuum systems, liquid and fuel gas piping, and water heaters and vents for same.